2009-2010

Projects completed in 2009:

 

1)      Delivery and installation of one (1) filter for circulation water, one (1) ball cleaning system at unit 1, TPP “Contour Global Maritsa East 3” AD;


2)      Cleaning the condenser tubes of Turbine 2 and 3 at TPP “Contour Global Maritsa East 3” AD;

3)      Replacing the internal corrosion resistant coating on pipeline sections and vessels at Units 5&6, “Kozloduy” NPP EAD;

4)      Erection of two units for desulphurization of petrol and diesel (HDS/HDA UNIT XO-5 and PRIME G UNIT XOB-1) at “Lukoil Neftochim Bourgas” AD:


1. Steel structure erection – 2400 t

2. Pre-fabrication of piping – 980 t

3. Installation of pipelines  – 1820 t

4. Production and installation of pipe supports  – 140 t

5. Installation of fittings and valves – 300 t

6. Installation of underground piping – 115 t

7. Heat treatment and non-destructive testing of welds – more than повече от 16 000 welds.

8. Sandblasting and corrosion resistant coating of piping and steel structures, including fire-proof paint application – 80 000 sq meters.

9. Installation of heating furnaces – 250 t

10. Installation ofcompressors – 250t

11. Installation ofpumps – 120 t

12. Installation ofair coolers  – 500 t

13. Installation ofother equipment (heat exchangers, vessels, etc. ) – 830 t

14. Thermal insulation – 40 000 sq m.

15. Electrical works, including installation of:

                        - 450 km Cables and cable traysfor them

                        - 6 kVIncoming lines – 2 pcs.

                        - 6 kVSwitchgears – 35 pcs.

                        - Motors 6 kV/1200kW – 12pcs.; Motors 0.4kV–154 pcs.

                        - Converter 6 kV2000 kW – 1 pc.

                        - Transformers 6 kV/400 V– 6 pcs.

                        - Capacitors 2000 kVAr 6 kV – 2 pcs.

                        - 400 VSwitchgears – 50pcs.          

                        - Frequency regulators – 22pcs.

                        - Pipelines with heat tracing and power panels thereto – 720pcs.

                        - Substation conditioner 2х200 kVA

                        - UPS power supply – 16 pcs.

                        - Reactors – 4 pcs.

                        - Site lighting, vessel lighting and internal and room lighting.

16. Substation construction at HDS/HAD, units XO-5 and XOB-1 at “Lukoil Neftochim BourgasAD

17. I&C  – Istallation of:

- I&C Instruments (sensors) – 4500 pcs.

- DCS System

- ESD System

- Fire Alarm System 

- Gas monitoring system  

- Intercom system

- CCTV – closed control television system 

- PLC for the compressors

 

Projects completed in 2010:

 

1)      Completion of the two units for desulphurization of petrol and diesel (HDS/HDA UNIT XO-5 and PRIME G UNIT XOB-1) at “Lukoil Neftochim Bourgas” AD.


2)      Design, delivery, and installation of ball cleaning systems and filters at Unit 4, TPP “Contour Global Maritsa East 3” AD;


3)      Replacement of the internal corrosion resistant coating on pipeline sections and vessels at Units 5&6 at “Kozloduy” NPP EAD.

4)      Cleaning the condenser tubes of Turbines 1 to 4 at TPP “Contour Global Maritsa East 3” AD;

Certificates

Our company has defended, possesses and implements Quality Management System EN ISO 9001:2008

         

Contacts

Euro Stars Ltd.

310 Bulgaria str., Post box 461

Ruse 7000, Bulgaria

Phone.: +359 82 813 300
Fax: +359 82 813 314

JoomShaper