  1. Replacement of the tube bundles at the condensers of the turbine driven feed-water pumps and implementation corrosion resistant coating on the tube plates and water chambers 5SD51, 6SD51 and 6SD52 of Units 5 and 6 at “Kozloduy” NPP EAD;
  2. Design, delivery,  installation and commissioning of a seawater cleaning system  at Units 1, 2 and 3 condensers of the TPP Varna EAD;
  3. Dismantling, construction and installation works at Unit 5of “Kozloduy” NPP EAD – replacement of the  1000 MW Turbine condenser of Unit 5;
  4. Design, delivery, installation and commissioning of  cleaning systems for circulation water and the condenser cooling surfaces at Units 2, 4, 5 and 6 of the TPP “Maritsa East 2” EAD;
  5. Implementation of thick corrosion resistant coating on the condensers of Units 2, 4, 5 and 6 of the TPP “Maritsa East 2” EAD.

Certificates

Our company has defended, possesses and implements Quality Management System EN ISO 9001:2008

         

Contacts

Euro Stars Ltd.

310 Bulgaria str., Post box 461

Ruse 7000, Bulgaria

Phone.: +359 82 813 300
Fax: +359 82 813 314

JoomShaper