2001-2002

Projects completed in 2001 – 2002:

 

  1. Delivery, installation and commissioning of a tube cleaning system for the turbine condensers of Units 3 and 4 at “Kozloduy” NPP  EAD – Turbines 5, 6 and 7;
  2. Replacement of six (6) filters for circulation water  at Unit 6, in collaboration with the European Consortium Framatome ANP;
  3. Design, delivery,  installation and commissioning of  a system  for seawater cleaning at Units 4, 5 and 6 condensers of the TPP Varna EAD;
  4. Corrosion resistant coating оf the tube plates and water chambers of  the 5SD52, Unit 5 of “Kozloduy” NPP EAD;
  5. Delivery and installation of eight (8) Ball cleaning systems for the condensers of the turbine driven feed-water pumps at the Units 5 and 6 of “Kozloduy” NPP EAD.

Certificates

Our company has defended, possesses and implements Quality Management System EN ISO 9001:2008

         

Contacts

Euro Stars Ltd.

310 Bulgaria str., Post box 461

Ruse 7000, Bulgaria

Phone.: +359 82 813 300
Fax: +359 82 813 314

JoomShaper